Electrical Engineering Services for Hillsdale Community Health Center

Posted by Ginger Greager

May 28, 2014 10:30:47 AM

Phase 1 Electrical Infrastructure Upgrades  |  Hillsdale, Michigan

Peter Basso Associates, Inc. (PBA) provided electrical engineering services to Hillsdale Community Health Center for the design of Phase 1 Electrical Infrastructure Upgrades. Upgrades included:

  • New normal power service to the existing hospital
  • New electrical switchgear and transformers to re-feed existing normal power loads in the hospital
  • New emergency generator and switchgear to re-feed existing emergency power loads in the hospital
  • Fuel system to support the generator, including (1) 6000 gallon diesel tank, piping, controls and accessories
  • Mechanical systems to support the generator building (Heating and Ventilating)

Phase 1 electrical infrastructure upgrades were planned in order to accommodate future Phase 2 electrical infrastructure upgrades.