MEP Engineering Blog

PBA Provides Commissioning Services for First Solar PGT-2 Manufacturing Plant in Ohio

Posted by Camille Thompson

Jul 3, 2019 3:57:00 PM

Full Production Expected Late 2019 for 1-Million SF Facility

First Solar is a 1-million-square-foot manufacturing plant being built for the production of its new Series 6 thin-film solar panels for use by large utility solar farms, on public buildings, and at off-grid industrial sites. This is the second First Solar manufacturing plant and it is located in Lake Township Ohio. Breaking ground in June 2018, the plant is expected to reach full production by late 2019.

Read More

Topics: Electrical, Commissioning, Manufacturing, Solar, First Solar, TAB

MEP Design and Architectural Lighting Design for Dicastal North America Industrial Campus

Posted by Tom Saccaro

May 2, 2016 9:20:47 AM

Renovations and Additions Underway at Existing 98-Acre Energy-Efficient Site

PBA provided MEP engineering design services to aluminum wheel manufacturer, Dicastal North America, for its $140 million manufacturing investment in Greenville, MI. The project is located on the former 98-acre site of United Solar Ovonics campus which had shut its doors in 2012 after filing for bankruptcy. Dicastal North America expects to produce three million wheels annually.

Read More

Topics: HVAC, MEP, Laboratory Design, Renovation, Industrial, Manufacturing, High Efficiency, Architectural Lighting

Subscribe to our Blog

Recent Posts

Posts by Topic

see all

Follow Me