The Ohio State University contracted Peter Basso Associates to provide engineering services to assess and evaluate the existing Building Automation/Control systems for Heating, Ventilating and Air-Conditioning (HVAC) equipment in 40 buildings on the main campus in Columbus, Ohio. Available existing building and shop drawings were reviewed and analyzed and field investigation work conducted to observe the condition and operation of the existing BAS and HVAC systems to develop an upgrade/replacement plan for BAS equipment. Upgrade/replacement options were prioritized based on cost, functionality, potential energy savings, and input from OSU staff. PBA coordinated and worked with The Ohio State University Building Automation Systems Group and Facilities Maintenance Group in order to complete the project.
These Stories on Energy