Renovated Hillel Day School Shines with Unique Architectural Lighting

Posted by Bob Roop

May 27, 2016 11:22:18 AM

MEP and Architectural Lighting Design Creates Enhanced Learning Environment

PBA provided MEP engineering design and architectural lighting design for the first, second and third phase of the Hillel Day School renovation project, which included a new classroom wing and renovations to the heart of the school on the first floor.

Read More

Topics: K-12, MEP, Renovation, Architectural Lighting, Technology

School Features Innovative Lighting Design

Posted by Bob Roop

May 27, 2016 10:30:51 AM

MEP Engineers Deliver On Time and Under Budget

PBA provided MEP engineering and architectural lighting design services for the construction of Plymouth-Canton Public School's new Liberty Middle School. The project was part of a $114 million bond that passed in 2013.

Read More

Topics: K-12, Education, Energy, HVAC, MEP, Innovative Solutions, Electrical Engineering, Middle School Design, Architectural Lighting, MEP Engineering

3 energy saving strategies to reduce impact of high occupancy spaces

Posted by Bob Roop

Nov 9, 2015 12:30:00 PM

Demand Control Ventilation and energy recovery methods can boost building efficiency

Some of the most challenging areas confronting the designers of HVAC systems for K-12 schools are the high occupant load areas such as Cafeterias, Gymnasiums and Auditoriums. Code dictates a very high occupant load which must then be accounted for in the heating/cooling calculations, but that occupant load also translates into a code-prescribed outside air ventilation rate.

Read More

Topics: K-12, Energy, HVAC, MEP

Energy Audit for Franklin Energy, Delton Kellogg Public Schools Consumers Energy Pilot Program

Posted by Peter Basso Associates, Inc.

Apr 23, 2015 2:11:00 PM

PBA Provides Energy Audit Commissioning Services for K-12 District

As part of Consumers Energy's plan to provide K-12 school districts in Michigan with an Energy Management Plan (EMP) based on recommendations from building assessments, PBA was brought on board to provide energy audit level 2 commissioning services including Whole Building Energy Assessments, beginning with Consumers Energy’s pilot district, Delton Kellogg Public Schools.

Read More

Topics: Recent News, Electrical, K-12, Commissioning, Education, Energy

PBA's Bob Roop to Speak at MSBO Conference at Cobo Center

Posted by Peter Basso Associates, Inc.

Apr 22, 2015 11:54:00 AM

8348_HubSpot

Clinic to focus on MEP system integration

If you're planning to attend the MSBO conference at Cobo Center don't miss PBA's K-12 market leader, Bob Roop speaking from 8:30 am -11:45 am on April 30, at his clinic titled: D02 - Systems – HVAC, Electrical & Technology.  

Read More

Topics: Electrical, K-12, Education, Mechanical, Conference MSBO, HVAC

Green Design & Geothermal System for Battle Creek Public Schools

Posted by Ginger Greager

May 28, 2014 12:06:48 PM

Battle Creek Central High School Addition and Remodel  |  Battle Creek, MI

Battle Creek Central High School is located in the heart of Michigan’s third-largest city, Battle Creek. The 250,000 square foot existing facility, originally built in 1908 has since been recognized as a landmark within the community. In 2008, the district sought the need to both extensively renovate the landmark structure and to expand. The 160,800 sf expansion provided much needed additional educational space for the high school and district.

Read More

Topics: K-12

Power & Architectural Lighting Design for Tempe Preparatory Academy

Posted by Ginger Greager

May 28, 2014 11:13:00 AM

400 Block Addition | Tempe, AZ

To ease overcrowding at Tempe Preparatory Academy, Peter Basso Associates provided MEP engineering for the 5,000 sf addition to the existing campus.  Included were three new stand-alone buildings, or “pods.”  Pod A has two science classrooms/labs and associated preparation room, Pod B has five seminar/classrooms, and  Pod C has an art classroom and two offices.  Cooling is provided by rooftop units and a variable air volume system for control within each classroom.  Power and lighting were designed for the interior spaces, along with building-mounted exterior lighting.

Read More

Topics: K-12

MEP Services for East China Schools

Posted by Ginger Greager

May 28, 2014 11:11:00 AM

Marine City Middle School HVAC Replacement Project

Engineering the right building environment for Marine City Middle School included replacement of the existing electric heating and direct expansion packaged terminal air conditioning units with hot water heating and direct expansion cooling unit ventilators;  removal of the existing unit ventilator louvers, replacing with new; addition of two Roof Top Units with DX cooling, providing heating via duct mounted hot water tempering coils; revision of the hot water heating system configuration in the main boiler room and throughout most of the building; removal of all pneumatic controls - replacing with DDC controls and lastly, providing new electrical branch circuits to the new mechanical equipment.

Read More

Topics: K-12

Green Design for Whitmore Lake Public Schools

Posted by Ginger Greager

May 28, 2014 10:48:00 AM

Sustainable Design for Whitmore Lake High School, Whitmore Lake, Michigan

Whitmore Lake’s new high school is a model for sustainable design and innovation.  District personnel and school board members provided guiding vision and commitment, and maintained close involvement with the design team throughout the project.  The combined efforts of the team delivered a LEED® Silver rating for the project from the U.S. Green Building Council.

Read More

Topics: K-12